Close Menu
Straightnews

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Graduate in police den for illegal arms fabrication facility in Akwa Ibom

    March 16, 2026 --- 11:52 pm

    Seplat Showdown: Police arrest four, launch manhunt for fleeing suspects

    March 15, 2026 --- 11:46 pm

    Probe ₦5.9b NNPC Rebranding Cost, SERAP Tells Tinubu

    March 15, 2026 --- 11:21 pm
    Facebook X (Twitter) Instagram
    Trending
    • Graduate in police den for illegal arms fabrication facility in Akwa Ibom
    • Seplat Showdown: Police arrest four, launch manhunt for fleeing suspects
    • Probe ₦5.9b NNPC Rebranding Cost, SERAP Tells Tinubu
    • Akwa Ibom Rep Gives 150 Constituents Laptops, Cash After Training
    • 369 wards in Akwa Ibom To enjoy solar-powered water facilities – Commissioner
    • FAAC Shares N1.894trn February Revenue To FG, States, LGAs
    • Ebonyi Senator Gifts Tricycle to Akwa Ibom Person
    • Gov Eno Reaffirms commitment to safe, secure future for Akwa Ibom children
    Facebook X (Twitter) Instagram
    Straightnews
    • Home
    • About Us
      • About StraightNews
      • Our Philosophy
      • Editorial Board
    • News
      • Nationwide News
      • Community News
      • Regional News
        • North Central
        • North East
        • North West
        • South East
        • South South
        • South West
    • Nigeria
      • Politics
      • Economy
      • Education
      • Security
      • Energy
      • Agriculture
      • Health
      • Labour
      • Environment
      • Technology
      • Real Estate
      • Transportation
      • Judiciary
      • Electricity
    • Foreign
      • Africa
        • West Africa
        • South Africa
        • North Africa
        • East Africa
      • America
      • Asia
      • Europe
    • Social
      • Photo Gallery
      • Entertainment
      • Events
      • Fashion
      • Fitness
      • Short Stories
      • Lifestyle
      • Relationship
      • Travel
      • Specials
        • Personality Interview
        • Special Reports
        • Profile
    • Articles
      • Editorial
      • Opinion
      • Essay
    • Contact Us
    • Sports
    Straightnews
    Home»News»FG Reiterates Commitment To Completion Of Calabar-Itu Road
    News

    FG Reiterates Commitment To Completion Of Calabar-Itu Road

    straightnewsng.comBy straightnewsng.comFebruary 14, 2019 --- 10:07 pmNo Comments3 Mins Read
    WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    WhatsApp Facebook Twitter LinkedIn Pinterest Email

    The Federal government has restated its committment to the completion of the Calabar-Itu road which traverses Calabar, Odukpani, Itu, and Ikot Ebeng roads in Akwa Ibom and Cross River States.

    The Director, Federal Highway, South-South zone in the Federal Ministry of Power, Works and Housing, Mr Godwin Eke, who made this assurance during an inspection tour of the site on Thursday, explained that the Akwa Ibom section of the road is 12.2 kilometers, while the Cross River axis from Odukpani to the gas plant is 9.7 kilometers.

    “I can tell you that we have done quite a lot of federal roads both in Rivers, Bayelsa, Delta and Edo and the Federal Government is committed to complete the calabar– Itu – Ikot Ekpene road.

    “I have been to all those state. I think we have done more than 300 kilometers of roads. And we are still opening up some areas that we have not been done before and with time; we would cover the whole of South South Zone.

    “There is no South South State that is not benefiting from Federal Government roads construction.

    “The government wants to resolve the traffic issues of this corridor. By developing this access, we want to reduce the travel time to the barest minimum and reduce the number of accident on the road and also to give the community access to better facilities,” Eke said.

    On funding, the director said that for the past two to three years, funding has been constant even though it is not as big as expected, stressing that with constant funding, the project would be complete as scheduled.

    Also speaking, Mr Nkereuwem Ukpong, Controller Federal Ministry of Works, Akwa Ibom said that the project span two states of Cross River and Akwa Ibom, explaining that the Akwa Ibom section would be 12.2 km while Cross River section would be 9.7 km.

    Ukpong said that the federal government had completed payment of compensation for area spanning across 4.3km to ensure quick completion of the road.

    Speaking to newsmen the Julius Berger site Engineer, Mr Kehinde Bakare, said that project was going on as specified and would be completed on time with proper funding.

    He said, “Be rest assured that you are going to have a standard first class road here. That is what I believe people will want to see at the end of it. The delivery is not an issue as long as everything goes well.”

    Calabar Cross River States Federal Government Ikot Ebeng Itu Odukpani
    Share. WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email
    straightnewsng.com
    • Website

    Related Posts

    Probe ₦5.9b NNPC Rebranding Cost, SERAP Tells Tinubu

    March 15, 2026 --- 11:21 pm

    FAAC Shares N1.894trn February Revenue To FG, States, LGAs

    March 14, 2026 --- 10:19 pm

    From Mud to motorable: Tropicana Road Revives hope in Uyo community

    March 13, 2026 --- 8:13 pm

    Comments are closed.

    Search
    Our Picks
    Don't Miss
    Crime

    Graduate in police den for illegal arms fabrication facility in Akwa Ibom

    By straightnewsng.comMarch 16, 2026 --- 11:52 pm0

    Press Release A University of Uyo graduate, Koabasi Marsodi, the principal suspect is in the…

    Seplat Showdown: Police arrest four, launch manhunt for fleeing suspects

    March 15, 2026 --- 11:46 pm

    Probe ₦5.9b NNPC Rebranding Cost, SERAP Tells Tinubu

    March 15, 2026 --- 11:21 pm

    Akwa Ibom Rep Gives 150 Constituents Laptops, Cash After Training

    March 15, 2026 --- 12:31 am

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us
    About Us

    The publication is committed to the principles of development journalism. We are prepared to change the public perception that the profession is a harbinger of hate, blackmail, sycophancy, prejudice and falsehood.

    We pledge to use journalism practice to give voice to the voiceless and to give people of all shades of opinions an opportunity to tell their stories.
    We're accepting new partnerships right now.

    Recent Posts
    • Graduate in police den for illegal arms fabrication facility in Akwa Ibom
    • Seplat Showdown: Police arrest four, launch manhunt for fleeing suspects
    • Probe ₦5.9b NNPC Rebranding Cost, SERAP Tells Tinubu
    • Akwa Ibom Rep Gives 150 Constituents Laptops, Cash After Training
    • 369 wards in Akwa Ibom To enjoy solar-powered water facilities – Commissioner
    Facebook X (Twitter) Instagram Pinterest
    • Advertise With Us
    © 2026 Straightnews Wire Limited

    Type above and press Enter to search. Press Esc to cancel.